Our next big project is the top floor which will bring our total to 14 rooms (with only 10 more to go). The rooms on the top floor were originally laid out as six rooms and our first task was to remove the connecting walls to return them to their original layout.
Two bathrooms had to be removed and two doorways blocked off so that we might realise our vision of restoring the rooms to their former size. The remaining bathrooms had to be enlarged and refurbished and the whole floor had to be rewired and refloored.
Here are some pictures showing the work in progress – as you can see, we have been even bolder in our choice of colours!!!!